FINISHING.

Rabu, 13 Januari 2010

FINISHING.

1 Dividing.

Pipe which had been cut at the cutter knife and then winding into the Drier / drying process, after which it will cut on the Dividing of the pipe cutting machine. Pipe will be cut into four pieces for DTY, POY 8 to 94 bits and 6 bits for POY 110 mm. after the cut in this section, pieces of pipe on the bobbin is also called a half and will be processed into the bobbin so the finishing machine.

2 Finishing.

In this section bobbin half so will the process be a bobbin to be printed by the finishing machine is the printing process / pressed by the matrix. The matrix used in this machine are: size 76.3 76.4 76.2 and 76.0 mm to 69 mm bobbin DTY.

3 Quality Control.
Bobbin so that was generated from the finishing machine to be sorted by section / QC appropriate grade ie grade applies yantg AE, A, BK (bobbin pieces) Bp. (Bobbin broke) and Waste.

4. Packing.
Bobbin that has been sorted by the QC and the packing by packing into the box officer, to a large box containing 288 pcs perboxnya and one pallet consisting of 2 boxes into one pallet contains 576 pcs. For a small box or a single wall contains 92, one pallet boxes numbered 12, so one palletnya contains 1104 pcs. Officers must also menyamtumkan packing labels and pallet stock prior to the store to the storage products.

5. Delivery.
Delivery charge of checking back production before shipment to the warehouse in order to avoid mistakes penglabelan. Delivery is scheduled each day and the color required by customers.